Asphalt Paving
New asphalt installed over a prepared base; the heaviest service for lots that need a full surface refresh.
When it’s the right choice: When the existing surface is failing and the base needs to be re-engineered, not patched.
Commercial asphalt services
Compare all six services on one screen, then pick the deep page that matches your lot's needs.
New asphalt installed over a prepared base; the heaviest service for lots that need a full surface refresh.
When it’s the right choice: When the existing surface is failing and the base needs to be re-engineered, not patched.
Surface layer milled off and re-laid over a sound base; lighter than full paving.
When it’s the right choice: When the structural base is sound but the surface is cracked or rutted.
Targeted potholes and crack repair without rebuilding the lot.
When it’s the right choice: When isolated potholes or cracks need to be addressed without rebuilding the surface.
UV-protective surface coat for structurally sound asphalt; extends life on a 2–3 year cadence.
When it’s the right choice: When a structurally sound surface needs UV protection and surface refresh on a 2–3 year cadence.
Hot-applied sealant in cracks under 1/2 inch wide to stop water intrusion.
When it’s the right choice: When surface cracks haven't widened past 1/2 inch and you want to stop water intrusion before it reaches the base.
Parking-lot striping, fire-lane and accessibility-compliant markings, refreshed on a 1–2 year cadence on lots with high traffic and weather exposure.
When it’s the right choice: When the surface is sound but parking layout, ADA compliance, or fire-lane markings need refresh.