Mill & Overlay
Surface layer milled off and re-laid over a sound base; lighter than full paving.
What this service does
We mill off the failed surface layer, leave the structurally sound base in place, and lay a new asphalt course on top.
When it's the right choice
When the structural base is sound but the surface is cracked or rutted.
What to expect
Site walk; bid returned within 2 business days. Faster turnaround than full paving since the base stays; lot reopens within 24 hours of overlay placement.
What it costs
Lower per-square-foot than full paving since the base is preserved. Bid response shows the per-sqft range and the conditions that drive it.