2 business days
Bid turnaround
For multi-site facilities programs
Programs run with one named PM, a fixed scope matrix, and a quarterly reporting cadence — built for facilities directors comparing four to six vendors.
2 business days
Bid turnaround
$2,000,000 per occurrence / $4,000,000 aggregate
GL insurance limit
On-site assessment of the lot's condition, drainage, base, and access constraints; informs scope and sequencing.
Written scope, timeline, and price; named project lead; warranty terms attached.
Pre-construction notice to tenants/residents; signage; access plan; weather window confirmed.
Work proceeds on the locked scope; daily progress updates delivered to the named project contact.
Owner-led walk-through against the proposal scope; punch list captured and resolved before sign-off.
Sign-off package: scope-as-built, warranty document, next-cycle recommendations.
| Service | Project size | Duration |
|---|---|---|
| Sealcoating | 5K–25K sqft | 1–2 days |
| Crack filling | 5K–25K sqft | 1–2 days |
| Mill and overlay | 25K–75K sqft | 3–5 days |
| Full-depth replacement | 25K–75K sqft | 1–3 weeks |
| Line striping | 5K–150K sqft | 1–2 days |