Multi-site programs — standardized scope, named PM, predictable execution

Programs run with one named PM, a fixed scope matrix, and a quarterly reporting cadence — built for facilities directors comparing four to six vendors.

Aerial view of a multi-tenant retail parking lot with multiple building sections and extensive paving.
  • 2 business days

    Bid turnaround

  • $2,000,000 per occurrence / $4,000,000 aggregate

    GL insurance limit

How a multi-site program runs

  1. Site walk

    On-site assessment of the lot's condition, drainage, base, and access constraints; informs scope and sequencing.

  2. Proposal

    Written scope, timeline, and price; named project lead; warranty terms attached.

  3. Mobilization

    Pre-construction notice to tenants/residents; signage; access plan; weather window confirmed.

  4. Execution

    Work proceeds on the locked scope; daily progress updates delivered to the named project contact.

  5. QC walk

    Owner-led walk-through against the proposal scope; punch list captured and resolved before sign-off.

  6. Handoff & warranty

    Sign-off package: scope-as-built, warranty document, next-cycle recommendations.

Scope by service, size, and duration

Service Project size Duration
Sealcoating 5K–25K sqft 1–2 days
Crack filling 5K–25K sqft 1–2 days
Mill and overlay 25K–75K sqft 3–5 days
Full-depth replacement 25K–75K sqft 1–3 weeks
Line striping 5K–150K sqft 1–2 days