Asphalt Paving
New asphalt installed over a prepared base; the heaviest service for lots that need a full surface refresh.
What this service does
We remove the failed surface, re-engineer the base where needed, and lay new asphalt to a planned thickness for the lot's traffic.
When it's the right choice
When the existing surface is failing and the base needs to be re-engineered, not patched.
What to expect
Site walk; bid returned within 2 business days. Lot closure scheduled around your operations; full cure in 24–72 hours depending on weather and mix.
What it costs
Depends on lot size, base condition, and asphalt thickness. We publish per-square-foot ranges in the bid response with the variables that move the number.